Research

Paper

Advancing towards electro-bioremediation scaling-up: On-site pilot plant for successful nitrate-contaminated groundwater treatment

01

Summary

What the paper reports, in its own words.

Abstract

The potential of nitrate electro-bioremediation has been fully demonstrated at the laboratory scale, although it has not yet been fully implemented due to the challenges associated with scaling-up bioelectrochemical reactors and their on-site operation. This study describes the initial start-up and subsequent stable operation of an electro-bioremediation pilot plant for the treatment of nitrate-contaminated groundwater on-site (Navata site, Spain). The pilot plant was operated under continuous flow mode for 3 months, producing an effluent suitable for drinking water in terms of nitrates and nitrites (<50 mg NO 3 - L -1 ; 0 mg NO 2 - L -1 ). A maximum nitrate removal rate of 0.9 ± 0.1 kg NO 3 - m -3 d -1 (efficiency 82 ± 18 %) was achieved at a cathodic hydraulic retention time (HRT cat ) of 2.0 h with a competitive energy consumption of 4.3 ± 0.4 kWh kg -1 NO 3 - . Under these conditions, the techno-economic analysis estimated an operational cost of 0.40 € m -3 . Simultaneously, microbiological analyses revealed structural heterogeneity in the reactor, with denitrification functionality concentrated predominantly from the centre to the upper section of the reactor. The most abundant groups were Pseudomonadaceae, Rhizobiaceae, Gallionellaceae, and Xanthomonadaceae. In conclusion, this pilot plant represents a significant advancement in implementing this technology on a larger scale, validating its effectiveness in terms of nitrate removal and cost-effectiveness. Moreover, the results validate the electro-bioremediation in a real environment and encourage further investigation of its potential as a water treatment.

02

Extracted values

Every value pulled from the paper, with its source, so each number can be checked against the text.

Not yet extracted

This paper is queued for the MESSAI extraction pipeline. Experiment conditions, performance metrics, and structured parameters will appear here once it has been processed — check back, or open the original PDF above to read it now.

03

Chart explorer

Move the inputs this paper used and see how the predicted outcome shifts.

04

Explore model

The reactor in 3D, with flow you can switch on and off.

05

AI insights

Contradictions, gaps and opportunities found by comparing this paper with the corpus.

06

Compare similar papers

The nearest papers by system, materials and organisms, with their outcomes side by side.

No 3D model is mapped to this paper yet. The values extracted from it are listed under Extracted values.

0
Extracted values
2024
Year

Keywords

  • Bioremediation
  • Groundwater
  • Contaminated groundwater
  • Nitrate
  • Contamination
  • Environmental engineering

Cite

Alba Ceballos‐Escalera, Narcís Pous, Lluı́s Bañeras et al. (2024). Advancing towards electro-bioremediation scaling-up: On-site pilot plant for successful nitrate-contaminated groundwater treatment. Water Research. https://doi.org/10.1016/j.watres.2024.121618

PubMed
38663208