100% confidenceSpecialized BES research in advanced-systems focusing on advanced-configuration. In this study, two-phase continuous vertical flow constructed wetlands were installed with a pre-cleaner bioelectrochemical sys...
Generated by MESSAI extraction pipeline · review against source PDF
No 3D model is mapped to this paper yet. Parameter ranges above still place reported values on the literature distribution.
Abstract
In this study, two-phase continuous vertical flow constructed wetlands were installed with a pre-cleaner bioelectrochemical system for the removal of NH 4 + -N (60.41–85.78%), NO 3 − -N (25.55–35.18%), TN (57.80–84.65%), TKN (37.24–70.08%), PO 4 3− -P (38.89–63.40%), SO 4 2− (49.53–76.06%), and COD (25.83–74.70%) from municipal wastewater.
Keywords
Identifiers
- Journal
- Environmental Science: Water Research & Technology
- Year
- 2020