A 500-1000 MW coal-fired power plant project is being studied by 15 municipal electric utilities, combining advanced technologies for maximum performance, minimal risk, and environmental acceptability.

Generated by MESSAI extraction pipeline · review against source PDF

Extraction

Reported parameters

No values extracted from this paper yet.

No 3D model is mapped to this paper yet. Parameter ranges above still place reported values on the literature distribution.

Abstract

Fifteen municipal electric utilities are jointly studying the feasibility of developing a 500 MW to 1,000 MW coal-fired generation project. The project will combine advanced technologies seeking maximum performance, minimal risk and outstanding environmental acceptability. This paper describes engineering and financial studies comparing coal-firing technology alternatives such as Pulverized Coal (PC), Circulating Fluidized Bed and Integrated Gasifier Combined Cycle, and PC refinements including supercritical steam conditions and innovative use of gas turbine feedwater heating. The paper also examines options to minimize environmental impact. Use of high-efficiency steam plant technologies is found to be an environmental advantage. A prudent combination of sophisticated technologies is found to be cost-effective. Finally, the paper describes the project’s innovative joint development process.

Key findings

  • High-efficiency steam plant technologies are an environmental advantage.
  • A prudent combination of sophisticated technologies is cost-effective.
  • Use of advanced technologies minimizes environmental impact.