Specialized MES research in optimization focusing on performance-optimization. A wastewater treatment system has been established based on sulfate-reducing and sulfide—oxidizing processes for treating ...

Generated by MESSAI extraction pipeline · review against source PDF

Extraction

Reported parameters

2 extracted values

View extracted values

No 3D model is mapped to this paper yet. Parameter ranges above still place reported values on the literature distribution.

Abstract

A wastewater treatment system has been established based on sulfate-reducing and sulfide—oxidizing processes for treating organic wastewater containing high sulfate/sulfide. The influence of COD/SO42− ratio and hydraulic retention time (HRT) on removal efficiencies of sulfate, COD, sulfide and electricity generation was investigated. The continuous operation of the treatment system was carried out for 63 days with the optimum COD/SO42− ratio and HRT. The result showed that the COD and sulfate removal efficiencies were stable, reaching 94.8 ± 0.6 and 93.0 ± 1.3% during the operation. A power density level of 18.0 ± 1.6 mW/m² was obtained with a sulfide removal efficiency of 93.0 ± 1.2%. However, the sulfide removal efficiency and power density decreased gradually after 45 days. The results from scanning electron microscopy (SEM) with an energy dispersive X-ray (EDX) show that sulfur accumulated on the anode, which could explain the decline in sulfide oxidation and electricity generation. This study provides a promising treatment system to scale up for its actual applications in this type of wastewater.

Keywords

SulfideSulfateOxidizing agentWastewaterSulfurBioreactor

Identifiers

Journal
Molecules
Year
2023