Digital Controls Retrofit of a 290MW Combined Cycle Power Generation Plant
Gary W. Bostick, Russ Tinkham
AI summary
90% confidenceMES research in membrane, performance. Public Service Company of Oklahoma (PSO) operates a combined cycle, Westinghouse PACE genera...
Generated by MESSAI extraction pipeline · review against source PDF
Reported parameters
No values extracted from this paper yet.
No 3D model is mapped to this paper yet. Parameter ranges above still place reported values on the literature distribution.
Abstract
Public Service Company of Oklahoma (PSO) operates a combined cycle, Westinghouse PACE generating station which was commissioned in 1972. The plant consists of two Westinghouse 501B6 gas turbines, two heat recovery steam generation units with afterburners, and a single 120MW steam turbine generator. PSO made the decision to upgrade the complete plant control with a state-of-the-art triple modular redundant control system, designed to provide entire control of the generating station. The paper describes the overall retrofit project, from project conception and justification through installation, commissioning and operating results.
Keywords
Identifiers
- Journal
- 1989 Joint Power Generation Conference: GT Papers
- Year
- 1989