MES research in membrane, performance. At the end of 1988 a 22,000 p.e. municipal wastewater treatment plant in Northern Germany wa...

Generated by MESSAI extraction pipeline · review against source PDF

Extraction

Reported parameters

2 extracted values

View extracted values

No 3D model is mapped to this paper yet. Parameter ranges above still place reported values on the literature distribution.

Abstract

At the end of 1988 a 22,000 p.e. municipal wastewater treatment plant in Northern Germany was converted to the EASC-biological phosphorus removal process. By simple modifications of the flow scheme of the plant, one of two existing primary clarifiers was converted to an anaerobic basin, into which both sewage and recycle sludge are fed. The supernatant as well as the sludge withdrawn from the bottom are discharged into the aeration basin. This operation mode achieves very good phosphorus uptake in the aeration basin. Since start up in November '88, the uptake-capacity increased continually, since April '89 phosphorus is removed down to concentrations of less than 1 mg/l PO4-P in the aeration basin. Due to an inadequate design and size of the existing final clarifier, phosphorus bleedback occurs and reduces removal efficiency. This bleedback could be minimized by either intensifying denitrification or reducing sludge detention time in the final clarifier.

Keywords

ClarifierPhosphorusAerationEnhanced biological phosphorus removalAerated lagoonEnvironmental engineering

Identifiers

Journal
Water Science and Technology
Year
1990